About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Home Button
Welcome Button
Mission Button
Our Programs Button
Advisory Committee Button
SMR Subcommittee Button
News Room Button
General Information
Document and Media Library Button
Job Opportunities Button
Sitemap Button
Stay Connected Header
Sign up for email Nuclear Energy alerts.
Jump into the Students zone!
Poster City Students click here!
Educators Header
Educators Image
Blue Ribbon Commission on America’s Nuclear Future

Missions

Apollo 11
Lunar Surface
14-Jul-69
Status: Radioisotope heater units for seismic experimental package. Station was shut down August 3, 1969..

Transit 4A
Navigational
29-Jun-61
Status: RTG operated for 15 years. Satellite now shut down but operational.

Transit 4B
Navigational
15-Nov-61
Status: RTG operated for 9 years. Satellite operated periodically after 1962 high altitude test. Last reported signal in 1971.

Transit
5-BN-1
Navigational
28-Sept-63
Status: RTG operated as planned. Non-RTG electrical problems on satellite caused satellite to fall after 9 months.

Transit
5-BN-2
Navigational
5-Dec-63
Status: RTG operated for over 6 years. Satellite lost ability to navigate after 1.5 years.

Transit
5-BN-3
Navigational
21-Apr-64
Status: Mission was aborted because of launch vehicle failure. RTG burned up on re-entry as designed.

Planetary
2-Mar-72
Status: RTGs still operating. Spacecraft successfully operated to Jupiter and is now beyond orbit of Pluto.

Planetary
5-Apr-73
RTGs still operating. Spacecraft successfully operated to Jupiter, Saturn, and beyond.

Viking 1
Mars surface
20-Aug-75
Status: RTGs operated for over 6 years until lander was shut down.

Viking 2
Mars surface
9-Sept-75
Status: RTGs operated for over 4 years until relay link was lost.

Nimbus-B-1
Meteorological
18-May-68
Status: Mission was aborted because of range safety destruct. RTG heat sources recovered and recycled.

Nimbus III
Meteorological
14-Apr-69
Status: RTGs operated for over 2.5 years.

Apollo 13
Lunar surface
11-Apr-70
Status: Mission aborted on the way to the moon. RTG re-entered earth's atmosphere and landed in South Pacific Ocean. No radiation was released.

Apollo 15
Lunar surface
26-Jul-71
Status: RTG operated for over 6 years until station was shut down.

Apollo 16
Lunar surface
16-Apr-72
Status: RTG operated for about 5.5 years until station was shut down.

Apollo 17
Lunar surface
7-Dec-72
Status: RTG operated for almost 5 years until station was shut down.

Apollo 12
Lunar surface
14-Nov-69
Status: RTG operated for about 8 years until station was shut down.

Apollo 14
Lunar surface
31-Jan-71
Status: RTG operated for over 6.5years until station was shut down.

Apollo 17
Lunar surface
7-Dec-72
Status: RTG operated for almost 5 years until station was shut down.

“Transit”
(Triad-01-1X)
Navigational
2-Sept-72
Status: RTG still operating.

LES 8*
Communications
14-Mar-76
Status: RTGs still operating.

LES 9*
Communications
14-Mar-76
Status: RTGs still operating.

Planetary
20-Aug-77
RTGs still operating. Spacecraft successfully operated to Jupiter, Saturn, Uranus, Neptune, and beyond.

Planetary
5-Sept-77
RTGs still operating. Spacecraft successfully operated to Jupiter, Saturn, and beyond.

Planetary
18-Oct-89
Status: Spacecraft destroyed after completion of mission.

Planetary/Solar
6-Oct-90
Status: RTG still operating.

Planetary
15-Oct-97
Status: RTGs still operating. Spacecraft obtaining information at Saturn.

New Horizons
Planetary
19-Jan-06
Status: RTG still operating. Spacecraft en route to Pluto.
Our Goals Header
Our Goals button
Inspector General | DOE Directives | Small Business
The White House Link: Energy.Gov/RECOVERY usa.gov E-gov IQ FOIA Link: Privacy Program
Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment