About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Home Button
Welcome Button
Mission Button
Our Programs Button
Advisory Committee Button
SMR Subcommittee Button
News Room Button
General Information
Document and Media Library Button
Job Opportunities Button
Sitemap Button
Stay Connected Header
Sign up for email Nuclear Energy alerts.
Jump into the Students zone!
Poster City Students click here!
Educators Header
Educators Image
Blue Ribbon Commission on America’s Nuclear Future

Publications

report cover   Nuclear Power 2010 - Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Project
August 30, 2012
finalreport   Simulated ITAAC Closure and Verification Demonstration Final Report
July 2011
Viability of Developing a U.S. Domestic Source for Large Forgings for
                                           Nuclear Power Plants - A Cost/Benefit Study   Viability of Developing a U.S. Domestic Source for Large Forgings for Nuclear Power Plants - A Cost/Benefit Study
March 24, 2010
Report on Lessons Learned from the NP 2010 
                                        Early Site Permit Program   Report on Lessons Learned from the NP 2010 Early Site Permit Program
March 26, 2008
 

Geotechnical, Geological, and
                                        Seismological(GG&S) Evaluations for the Bellefonte Site, North Alabama, March 2006   Geotechnical, Geological, and Seismological (GG&S) Evaluations for the Bellefonte Site, North Alabama,
March 2006
 

DOE NP2010 Nuclear 
                                       Power Plant Construction Infrastructure Assessment, October 2005   DOE NP2010 Nuclear Power Plant Construction Infrastructure Assessment, October 2005

ABWR Cost/Schedule/COL Project at
                                        TVA's Bellefonte Site, August 2005   ABWR Cost/Schedule/COL Project at TVA's Bellefonte Site,
August 2005
 

Nuclear Power 2010 Texas Gulf Coast Nuclear Feasibility Study conducted by the Texas Institute for Advancement of Chemical Technology (TIACT), February 28, 2005

Nuclear Power 2010
                                         Texas Gulf Coast Nuclear Feasibility Study conducted by the Texas Institute for Advancement of Chemical Technology (TIACT)  
 

U.S. Job Creation Due to Nuclear Power Resurgence in the United States, November 2004

Volume 1
U.S. Job Creation Due to Nuclear
                                         Power Resurgence in the United States, November 2004 Volume 1
  Volume 2
U.S. Job Creation Due to Nuclear Power Resurgence in the United States, November 2004 Volume 2
 

The Economic Future of Nuclear Power Study conducted by the University of Chicago, August 2004

The Economic Future of Nuclear Power Study conducted by the University of Chicago  
 

NP2010 Improved Construction Technologies, O&M Staffing and Cost, Decommissioning Costs, and Funding Requirements Study conducted by Dominion Energy

Volume 1: Study of Construction
                                         Technologies and Schedules, O&M Staffing and Cost, Decommissioning Costs and Funding Requirements for Advanced Reactor Designs   Volume 1:
Study of Construction Technologies and Schedules, O&M Staffing and Cost, Decommissioning Costs and Funding Requirements for Advanced Reactor Designs, May 27, 2004
Volume 2: MPR-2627 DOE NP2010 Construction Schedule Evaluation   Volume 2: MPR-2627
DOE NP2010 Construction Schedule Evaluation, September 24, 2004
Volume 2: MPR-2610Application of
                                         Advanced Construction Technologies to New Nuclear Power Plants   Volume 2: MPR-2610
Application of Advanced Construction Technologies to New Nuclear Power Plants, September 24, 2004
 


U.S. Department of Energy/Nuclear Power
                                         Industry, Strategic Plan, For Light Water Reactor Research and Development   U.S. Department of Energy/Nuclear Power Industry, Strategic Plan, For Light Water Reactor Research and Development, February 2004
 

Early Site Permit (ESP) Scoping Studies

Study of Potential Sites for
                                         the Deployment of New Nuclear Plants in the United States   Study of Potential Sites for the Deployment of New Nuclear Plants in the United States,
September 27, 2002
Site Selection Evaluation for
                                         Pebble Bed Modular Reactor (PBMR) Generating Unit   Site Selection Evaluation for Pebble Bed Modular Reactor (PBMR) Generating Unit, August, 2002
 

A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010, October 31, 2001

Volume I
Summary Report
A Roadmap to Deploy New Nuclear
                                           Power Plants in the United States by 2010 Volume I Summary Report
  Volume II
Summary Report
A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010 Volume II Summary Report
 
Inspector General | DOE Directives | Small Business
The White House Link: Energy.Gov/RECOVERY usa.gov E-gov IQ FOIA Link: Privacy Program
Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment