About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Home Button
Welcome Button
Mission Button
Our Programs Button
Advisory Committee Button
SMR Subcommittee Button
News Room Button
General Information
Document and Media Library Button
Job Opportunities Button
Sitemap Button
Stay Connected Header
Sign up for email Nuclear Energy alerts.
Jump into the Students zone!
Poster City Students click here!
Educators Header
Educators Image
Blue Ribbon Commission on America’s Nuclear Future

Nuclear Power Deployment Scorecard

Powering Future Decades

April 9, 2009
< Back to Scorecard

New Nuclear Plant Deployment
Current State of the Industry

Combined Construction and Operating License (COL)

Summary: All seventeen COL applications submitted have been docketed for NRC review. NRC has suspended review of four COL applications pending technology review or a shift in the utility's resources. A total of twenty power companies, of which one remains unidentified, intend to submit 23 license applications for 34 units. The Reference COL (R-COL) application has been submitted for all five reactor designs; the 18 subsequent COLs (S-COLs) will incorporate the corresponding R-COL application by reference, noting any site-specific departures. No COLs have been issued to date.

  UTILITY SITE/
LOCATION
REACTOR/
NO. UNITS
COLA
DATES
REVIEW PHASE
Submitted Docketed Saftey4 Environ.5
COL Applications Submitted STP Nuclear Operating Co. South Texas Project TX ABWR1 2 9/07 11/29/07 Ph. 1 Ph. 2
TVA (NuStart) Bellefonte AL AP10001 2 10/07 1/18/08 Ph. 1 Ph. 2
Dominion Energy North Anna VA ESBWR1 1 11/07 1/28/08 Ph. 2 Ph. 3
Duke Energy William States Lee SC AP1000 2 12/07 2/25/08 Ph. A TBD
Progress Energy Shearon Harris NC AP1000 2 2/08 4/17/08 Ph. A Ph. 2
Entergy (NuStart) Grand Gulf MS Unspecified2 1 2/08 4/17/08 Suspended Suspended
UniStar (Constellation) Calvert Cliffs MD EPR1 1 3/08 6/3/08 Ph. 1 Ph. 1
Southern Nuclear Vogtle GA AP1000 2 3/08 5/30/08 Ph. A Ph. 2
SCE&G V.C. Summer SC AP1000 2 3/08 7/31/08 Ph. A Ph. 1
Progress Energy Levy County FL AP1000 2 7/30/08 10/6/08 Ph. A Ph. 1
Exelon Generation Victoria County TX Unspecified2 2 9/3/08 10/30/08 Suspended Suspended
DTE Energy Fermi MI ESBWR 1 09/18/08 11/25/08 TBD TBD
Luminant (TXU) Comanche Peak TX US-APWR1 2 9/19/08 12/2/08 Ph. 1 Ph. 1
Entergy River Bend LA Unspecified2 1 9/25/08 12/4/08 Suspended Suspended
AmerenUE (UniStar) Callaway MO EPR 1 7/24/08 12/12/08 TBD TBD
UniStar (Constellation) Nine Mile Point NY EPR 1 9/30/08 12/12/08 Suspended Ph. 1
PPL (UniStar) Bell Bend PA EPR 1 10/10/08 12/19/08 TBD TBD
Planned COL Applications
Alternate Energy (UniStar) Hammett ID EPR 1 2009 N/A
Amarillo Power (UniStar) Vicinity of Amarillo TX EPR 2 2009 N/A
Florida Power and Light Turkey Point FL AP1000 2 6/30/2009 N/A
Transition Power Blue Castle UT Unspecified 1 2010 N/A
UniStar Utility 'A' Unspecified Unspecified 1 2010 N/A
Southern Nuclear Unspecified, greenfield Unspecified 1 2011 N/A

1    Reference COL Application (R-COL)
2    COLA submitted for ESBWR but utility considering different technologies
3    NRC Review deferred to focus on R-COL
4     Safety Review Phases:

R-COL: Ph 1 Issue RAIs   Ph 2 SER w/ Open Items   Ph 3 ACRS Review   Ph 4 Advanced SER/ No OI   Ph 5 ACRS Review   Ph 6 Final SER
S-COL: Ph A Issue RAIs and supplemental RAIs   Ph B Advanced SER/ No OI   Ph C ACRS Review   Ph D Final SER

5     Environmental Review Phases:

Ph 1 Environmental Scoping Report   Ph 2 Draft EIS   Ph 3 Public comment   Ph 4 Final EIS


Inspector General | DOE Directives | Small Business
The White House Link: Energy.Gov/RECOVERY usa.gov E-gov IQ FOIA Link: Privacy Program
Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment