About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Home Button
Welcome Button
Mission Button
Our Organization Button
Our Programs Button
Advisory Committee Button
News Room Button
General Information
Document and Media Library Button
Job Opportunities Button
Sitemap Button
Stay Connected Header
Sign up for email Nuclear Energy alerts.
Jump into the Students zone!
Poster City Students click here!
Educators Header
Educators Image
Blue Ribbon Commission on America’s Nuclear Future

Quarterly Nuclear Deployment Summary

Moving Toward Deployment

October 2011

Quarterly News

  • TVA has decided to complete its Bellefonte 1 reactor, a Babcock & Wilcox Pressurized Water Reactor. The $4.9 billion project is reported to begin operation between 2018-2020 and generate 1260 MWe. The NRC approved the October 8, 2010 request to extend the construction permit until October 1, 2020.


  • The Advisory Committee on Reactor Safeguards has stated that it agrees with the NRC staff’s Final Safety Evaluation Report on the AP1000 design certification amendment, which was issued in August.


  • Southern Company has received the Final Safety Evaluation Report from the Nuclear Regulatory Commission for Vogtle Units 3 and 4. The NRC held the first mandatory hearing in the new Part 52 new reactor licensing process on September 27-28. The Vogtle COL application is the first to reach the final stages in the new Part 52 new reactor licensing process.


  • South Carolina Electric & Gas have received the Final Safety Evaluation Report for V.C. Summer Units 2 and 3 from the NRC and had a mandatory hearing on the application for Combined Licenses (COL) on October 12 and 13.


  • Duke Energy Carolinas signed a letter of intent for a potential minority interest in Santee Cooper’s 45 percent ownership at the V.C. Summer site in South Carolina.


  • Detroit Edison’s COL application for Fermi Unit 3 is now expected to be completed in May 2013 due to delays in the safety review.


  • Fluor Corp. has invested $30 million into NuScale’s 45 MW small modular reactor, giving Fluor 55% ownership of NuScale.
COL Applications Submitted
UTILITY SITE/
LOCATION
REACTOR/
NO. UNITS
COLA
DATES
REVIEW PHASE IN PROGRESS
Submitted Docketed Safety4 Environ.5
Southern Nuclear Vogtle GA AP10001 2 3/31/08 5/30/08 Completed Completed
SCE&G V.C. Summer SC AP1000 2 3/27/08 7/31/08 Completed Completed
STP Nuclear Operating Co. South Texas Project TX ABWR1 2 9/07 11/29/07 Ph. 2 Completed
Luminant (TXU) Comanche Peak TX US-APWR1 2 9/19/08 12/2/08 Ph. 2 Completed
UniStar (Constellation) Calvert Cliffs MD US-EPR1 1 3/08 6/3/08 Ph. 2 Completed
DTE Energy Fermi MI ESBWR 1 09/18/08 11/25/08 Ph. 2 Ph. 2
Dominion Energy North Anna VA US-APWR 1 11/27/07 1/28/08 Ph. A Ph. 2
Duke Energy William States Lee SC AP1000 2 12/13/07 2/25/08 Ph. B Ph. 2
Florida Power and Light Turkey Point FL AP1000 2 6/30/09 9/8/09 Ph. A Ph. 2
PPL (UniStar) Bell Bend PA US-EPR 1 10/10/08 12/19/08 Ph. A Ph. 2
Progress Energy Shearon Harris NC AP1000 2 2/19/08 4/17/08 Ph. B Ph. 2
Progress Energy Levy FL AP1000 2 7/30/08 10/6/08 Ph. B Ph. 3
Suspended
Entergy (NuStart) Grand Gulf MS ESBWR 1 2/08 4/17/08 Suspended Suspended
Entergy River Bend LA ESBWR 1 9/25/08 12/4/08 Suspended Suspended
AmerenUE (UniStar) Callaway MO US-EPR 1 7/24/08 12/12/08 Suspended Suspended
UniStar (Constellation) Nine Mile Point NY US-EPR 1 9/30/08 12/11/08 Suspended Suspended
TVA (NuStart) Bellefonte AL AP1000 2 10/07 1/18/08 Suspended Suspended

1    Reference COL Application (R-COL)
4    Safety Review Phases:

R-COL: Ph 1 Issue RAIs   Ph 2 SER w/ Open Items   Ph 3 ACRS Review   Ph 4 Advanced SER/ No OI   Ph 5 ACRS Review   Ph 6 Final SER
S-COL: Ph A Issue RAIs & supplemental RAIs   Ph B Advanced SER/ No OI   Ph C ACRS Review   Ph D Final SER

5    Environmental Review Phases:

Ph 1 Environmental Scoping Report   Ph 2 Draft EIS   Ph 3 Public comment   Ph 4 Final EIS


  Nuclear Power Deployment Status

Design Certification (DC) >

  • Two reactor designs that are being considered for future builds are certified; three new designs and two amendments are under NRC review.

Early Site Permit (ESP) >

  • Four ESPs issued by NRC.
  • Two ESP applications under NRC review.
  • Two ESP applications anticipated in the near future.

New Nuclear Plant Orders >

  • Nine utilities have ordered large, long-lead nuclear component forgings from three reactor vendors.
  • Four Engineering, Procurement, and Construction Contracts signed (Vogtle, V.C. Summer, STP, and Levy).

New Plant Construction, Operation, Deferral >

  • TVA is proceeding with the completion of the Watts Bar 2 and Bellefonte 1 reactors.
  • Vogtle Units 3 and 4 and V.C. Summer Units 2 and 3 are on schedule with COLs expected to be issued in late 2011 and early 2012.

Federal Financial Incentives >

  • Nuclear Power Loan Guarantees – DOE authorized to guarantee $20.5 billion in loans for nuclear projects; $10.33 billion has been conditionally committed.
  • Standby Support (Risk Insurance) – DOE authorized to issue insurance to six reactors to cover delays in operations attributed to NRC licensing reviews or litigation.
  • Production Tax Credits – 1.8 cents/kw tax credit for the first 6,000 MWe of deployed nuclear power.
Inspector General | DOE Directives | Small Business
The White House Link: Energy.Gov/RECOVERY usa.gov E-gov IQ FOIA Link: Privacy Program
Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment