About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Home Button
Welcome Button
Mission Button
Our Organization Button
Our Programs Button
Advisory Committee Button
News Room Button
General Information
Document and Media Library Button
Job Opportunities Button
Sitemap Button
Stay Connected Header
Sign up for email Nuclear Energy alerts.
Jump into the Students zone!
Poster City Students click here!
Educators Header
Educators Image
Blue Ribbon Commission on America’s Nuclear Future

Quarterly Nuclear Deployment Summary

Moving Toward Deployment

October 2010

Quarterly News

  • Constellation Energy Group announced on October 11th that it would not move forward with an application for a federal loan guarantee for the Calvert Cliff 3 nuclear power plant in Calvert County Maryland, citing high government financing costs as the reason.
     
  • TVA signed a contract with AREVA on October 4 for Engineering and Development of TVA's Bellefonte Unit 1 Nuclear Plant. On September 29, TVA requested that NRC defer review of the COL application for Bellefonte Units 3 and 4. Previously, on August 20, TVA approved $248M toward engineering and site preparation for restart of Bellefonte Unit 1.
     
  • Alternate Energy selected Payette County on August 10 as their sole Idaho nuclear site, terminating proceedings in Elmore County.
     
  • NRC docketed PSEG's ESP application for a site adjacent to their Salem and Hope Creek reactors in New Jersey on August 6.
     
  • NRC invited public input on the Draft Environmental Impact Statements (DEIS) for Comanche Peak, Levy, and Vogtle COLAs and announced public meetings scheduled September 21, September 23, and October 7, 2010, respectively.
     
  • NRC established Atomic Safety and Licensing Boards (ASLBs) for Comanche Peak and Turkey Point in response to petitions filed by interveners; an ASLB will hear arguments for STP October 21.
     
  • Westinghouse awarded GSE Systems two AP1000 simulator contracts: for Vogtle on July 30, and V.C. Summer on September 23.
     
COL Applications Submitted
UTILITY SITE/
LOCATION
REACTOR/
NO. UNITS
COLA
DATES
REVIEW PHASE
Submitted Docketed Safety4 Environ.5
Southern Nuclear Vogtle GA AP10001 2 3/08 5/30/08 Ph. 4 ESP
STP Nuclear Operating Co. South Texas Project TX ABWR1 2 9/07 11/29/07 Ph. 2 Ph. 4
Luminant (TXU) Comanche Peak TX US-APWR1 2 9/19/08 12/2/08 Ph. 2 Ph. 3
UniStar (Constellation) Calvert Cliffs MD US-EPR1 1 3/08 6/3/08 Ph. 1 Ph. 4
DTE Energy Fermi MI ESBWR 1 09/18/08 11/25/08 Ph. 1 Ph. 2
Dominion Energy North Anna VA US-APWR 1 11/07 1/28/08 Ph. 4 EIS Issued
Duke Energy William States Lee SC AP1000 2 12/07 2/25/08 Ph. A Ph. 2
Florida Power and Light Turkey Point FL AP1000 2 6/30/09 9/8/09 Ph. A Ph. 1
PPL (UniStar) Bell Bend PA US-EPR 1 10/10/08 12/19/08 Ph. B Ph. 2
Progress Energy Shearon Harris NC AP1000 2 2/08 4/17/08 Ph. A Ph. 2
Progress Energy Levy County FL AP1000 2 7/30/08 10/6/08 Ph. A Ph. 3
SCE&G V.C. Summer SC AP1000 2 3/08 7/31/08 Ph. B Ph. 2
TVA (NuStart) Bellefonte AL AP1000 2 10/07 1/18/08 Ph. 1 Ph. 2
Suspended
Entergy (NuStart) Grand Gulf MS Unspecified 1 2/08 4/17/08 Suspended Suspended
Entergy River Bend LA Unspecified 1 9/25/08 12/4/08 Suspended Suspended
AmerenUE (UniStar) Callaway MO US-EPR 1 7/24/08 12/12/08 Suspended Suspended
UniStar (Constellation) Nine Mile Point NY US-EPR 1 9/30/08 12/12/08 Suspended Ph. 1
Planned COL Applications
Alternate Energy (UniStar) Payette County ID TBD 2 2011 (2nd Quarter) N/A
Alternate Energy (UniStar) Pueblo, Colorado CO TBD 2 2012 (2nd Quarter) N/A
Southern Nuclear Unspecified, greenfield Unspecified 1 2011 N/A
Transition Power Blue Castle UT Unspecified 1 2011 N/A
Unidentified Utility 'A' Unspecified Unspecified 1 2011 N/A
Unidentified Utility 'B' Unspecified Unspecified 1 2011 N/A

1    Reference COL Application (R-COL)
4    Safety Review Phases:

R-COL: Ph 1 Issue RAIs   Ph 2 SER w/ Open Items   Ph 3 ACRS Review   Ph 4 Advanced SER/ No OI   Ph 5 ACRS Review   Ph 6 Final SER
S-COL: Ph A Issue RAIs & supplemental RAIs   Ph B Advanced SER/ No OI   Ph C ACRS Review   Ph D Final SER

5    Environmental Review Phases:

Ph 1 Environmental Scoping Report   Ph 2 Draft EIS   Ph 3 Public comment   Ph 4 Final EIS


  Nuclear Power Deployment Status

Early Site Permit (ESP) >

  • Four ESPs issued by NRC.
  • Two ESP applications under NRC review.
  • Two ESP applications expected in 2010-2012.

Design Certification (DC) >

  • Two advanced reactor designs certified by NRC.
  • Four reactor designs undergoing NRC review.

Combined Construction & Operating License (COL) >

  • Eighteen COL applications submitted to NRC.
  • Thirteen COL applications under NRC review.
  • Four COL applications suspended pending technology decision or for financial reasons.
  • One COL application withdrawn and replaced with ESP application.

New Nuclear Plant Orders >

  • Eight utilities have ordered large, long-lead nuclear component forgings from three reactor vendors.
  • Four Engineering, Procurement, and Construction Contracts signed (Vogtle, V.C. Summer, STP, and Shearon Harris).
  • TVA resumed construction of Watts Bar 2; construction permits reinstated for Bellefonte 1 & 2.
  • Site prep work has started at four facilities.

Federal Financial Incentives >

  • Nuclear Power Loan Guarantees – DOE authorized to guarantee $20.5 billion in loans for nuclear projects; $10.33 billion has been conditionally committed.
  • Standby Support (Risk Insurance) – DOE authorized to issue insurance to six reactors to cover delays in operations attributed to NRC licensing reviews or litigation.
  • Production Tax Credits – 1.8 cents/kw tax credit for the first 6,000 Mwe of deployed nuclear power.
Inspector General | DOE Directives | Small Business
The White House Link: Energy.Gov/RECOVERY usa.gov E-gov IQ FOIA Link: Privacy Program
Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment