About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Home Button
Welcome Button
Mission Button
Our Organization Button
Our Programs Button
Advisory Committee Button
News Room Button
General Information
Document and Media Library Button
Job Opportunities Button
Sitemap Button
Stay Connected Header
Sign up for email Nuclear Energy alerts.
Jump into the Students zone!
Poster City Students click here!
Educators Header
Educators Image
Blue Ribbon Commission on America’s Nuclear Future

Quarterly Nuclear Deployment Summary

Moving Toward Deployment

July 2010

Quarterly News

June 21 UK Government cancelled a loan to Sheffield Forgemasters for building an ultra-large forging press.

June 18 NRC announced an opportunity for public participation in a hearing on the COLA for two AP1000 units at Turkey Point, FL.

June 14 NRC docketed Exelon's ESP application for Victoria County, originally submitted as a COLA.

May 26 PSEG submitted an ESP application for a site adjacent to their Salem and Hope Creek reactors in New Jersey.

May 24 NRC invited public participation in an environmental scoping hearing for the William States Lee COLA.

May 20 AREVA was offered a $2 billion federal loan guarantee conditional agreement for the Eagle Rock Enrichment Facility in Idaho.

May 18 Dominion selected Mitsubishi US-APWR for the North Anna COLA in lieu of the ESBWR.

May 3 NRC announced an opportunity to participate in a hearing on the Limited Work Authorization request for the Vogtle COLA.

April 27 Payette County, Idaho, approved the site of a proposed Alternate Energy Holding nuclear plant.

April 21 NRC made the Calvert Cliffs and V.C. Summer Draft Environmental Impact Statement available for public comment on April 23.


COL Applications Submitted
UTILITY SITE/
LOCATION
REACTOR/
NO. UNITS
COLA
DATES
REVIEW PHASE
Submitted Docketed Safety4 Environ.5
STP Nuclear Operating Co. South Texas Project TX ABWR1  2  9/07 11/29/07 Ph. 2 Ph. 3
TVA (NuStart) Bellefonte AL AP1000 2 10/07 1/18/08 Ph. 1 Ph. 2
Dominion Energy North Anna VA US-APWR 1 11/07 1/28/08 Ph. 4 EIS Issued
Duke Energy William States Lee SC AP1000 2 12/07 2/25/08 Ph. A Ph. 2
Progress Energy Shearon Harris NC AP1000 2 2/08 4/17/08 Ph. A Ph. 2
Entergy (NuStart) Grand Gulf MS Unspecified2 1 2/08 4/17/08 Suspended Suspended
UniStar (Constellation) Calvert Cliffs MD US-EPR1 1 3/08 6/3/08 Ph. 1 Ph. 2
Southern Nuclear Vogtle GA AP10001 2 3/08 5/30/08 Ph. 4 ESP
SCE&G V.C. Summer SC AP1000 2 3/08 7/31/08 Ph. B Ph. 2
Progress Energy Levy County FL AP1000 2 7/30/08 10/6/08 Ph. A Ph. 2
Exelon Generation Victoria County TX N/A Withdrawn Now ESP Now ESP
DTE Energy Fermi MI ESBWR 1 09/18/08 11/25/08 Ph. 1 Ph. 2
Luminant (TXU) Comanche Peak TX US-APWR1 2 9/19/08 12/2/08 Ph. 2 Ph. 2
Entergy River Bend LA Unspecified2 1 9/25/08 12/4/08 Suspended Suspended
AmerenUE (UniStar) Callaway MO US-EPR 1 7/24/08 12/12/08 Suspended Suspended
UniStar (Constellation) Nine Mile Point NY US-EPR 1 9/30/08 12/12/08 Suspended Ph. 1
PPL (UniStar) Bell Bend PA US-EPR 1 10/10/08 12/19/08 Ph. B Ph. 2
Florida Power and Light Turkey Point FL AP1000 2 6/30/09 9/8/09 TBD TBD
Planned COL Applications
UTILITY SITE/
LOCATION
REACTOR/
NO. UNITS
COLA
DATES
REVIEW PHASE
Alternate Energy (UniStar) Payette or Elmore County ID TBD  2  2011 (2nd Quarter) N/A
Alternate Energy (UniStar) Pueblo, Colorado CO TBD 2 2012 (2nd Quarter) N/A
Amarillo Power (UniStar) Vicinity of Amarillo TX US-EPR 2 N/A N/A
Transition Power Blue Castle UT Unspecified 1 2010 N/A
Southern Nuclear Unspecified, greenfield Unspecified 1 2011 N/A
Unidentified Utility 'A' Unspecified Unspecified 1 2011 N/A
Unidentified Utility 'B' Unspecified Unspecified 1 2011 N/A

1 Reference COL Application (R-COL); 2 COLA submitted for ESBWR but utility considering different technologies; 3 COLA being changed to ESP
4 Safety Review Phases:

R-COL: Ph 1 Issue RAIs   Ph 2 SER w/ Open Items   Ph 3 ACRS Review   Ph 4 Advanced SER/ No OI   Ph 5 ACRS Review   Ph 6 Final SER
S-COL: Ph A Issue RAIs & supplemental RAIs   Ph B Advanced SER/ No OI   Ph C ACRS Review   Ph D Final SER

5 Environmental Review Phases:

Ph 1 Environmental Scoping Report   Ph 2 Draft EIS   Ph 3 Public comment   Ph 4 Final EIS


  Nuclear Power Deployment Status

Early Site Permit (ESP) >

  • Four ESPs issued by NRC.
  • Two ESP applications under NRC review.
  • Two ESP applications expected in 2010-2012.

Design Certification (DC) >

  • Two advanced reactor designs certified by NRC.
  • Four reactor designs undergoing NRC review.

Combined Construction & Operating License (COL) >

  • Eighteen COL applications submitted to NRC.
  • Thirteen COL applications under NRC review.
  • Four COL applications suspended pending technology decision or for financial reasons.
  • One COL application withdrawn and replaced with ESP application.

New Nuclear Plant Orders >

  • Eight utilities have ordered large, long-lead nuclear component forgings from three reactor vendors.
  • Four Engineering, Procurement, and Construction Contracts signed (Vogtle, V.C. Summer, STP, and Shearon Harris).
  • TVA resumed construction of Watts Bar 2; construction permits reinstated for Bellefonte 1 & 2.
  • Site prep work has started at four facilities.

Federal Financial Incentives >

  • Nuclear Power Loan Guarantees – DOE authorized to guarantee $20.5 billion in loans for nuclear projects; $10.33 billion has been conditionally committed.
  • Standby Support (Risk Insurance) – DOE authorized to issue insurance to six reactors to cover delays in operations attributed to NRC licensing reviews or litigation.
  • Production Tax Credits – 1.8 cents/kw tax credit for the first 6,000 Mwe of deployed nuclear power.
Inspector General | DOE Directives | Small Business
The White House Link: Energy.Gov/RECOVERY usa.gov E-gov IQ FOIA Link: Privacy Program
Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment