Nuclear Power Deployment Scorecard
Powering Future Decades
July 17, 2009
What's New
- Florida Power and Light submitted a COL application on June 30, 2009, for two AP 1000 reactors located at the Turkey Point site in Miami-Dade County, Florida.
- On June 30, Exelon announced it will seek an ESP for its proposed Victoria County site rather than a COL, citing economic uncertainties and limited availability of federal loan guarantees.
- Constellation Energy received final approval from the Maryland Public Service Commission (PSC) for Calvert Cliffs on June 30.
- Ameren UE requested on June 23 that NRC suspend all Callaway COL Application review activities, citing financial reasons. NRC had previously convened an Atomic Safety and Licensing Board (ASLB) panel, on May 1, to preside over Callaway hearings.
- In its proposed FY 2010 budget to Congress, released on May 27, NRC requested $248.3M for work on new reactors.
- On May 21, NRC announced public meetings to discuss environmental issues for the Nine Mile Point COL application, to be held in Oswego, N.Y. on June 10.
- NRC convened Atomic Safety and Licensing Board (ASLB) panels to preside over hearings on the following applications:
- Comanche Peak (Luminant), June 10 and 11
- South Texas Project (STPNOC) on June 23 and 24
- Bell Bend (PPL), hearing date not specified
Quick Statistics
- Early Site Permits issued—3
- Permits under review—1
- COL applications submitted—18
No. reactors submitted—28
- COL applications docketed—17
No. reactors docketed—26
Docketed but suspended—5
- Total expected license applications—23
Expected number of reactors—34
- Certified reactor designs—2
- Reactor designs under review—4
- Announced plant locations—21
- Companies applying for COL—20
Number of Planned Reactors (34)
Vendor Technology Under Consideration
General Electric
- Advanced Boiling Water Reactor (ABWR) – 1,356 MWe (certified 10CFR52 App A)
- Economic Simplified Boiling Water Reactor (ESBWR) – 1,560 MWe
Westinghouse
- Advanced Passive Pressurized Water Reactor (AP1000) – Twin units 1,117 MWe each (certified 10CFR52 App D)
AREVA
- United States Evolutionary Pressurized Water Reactor (US EPR) – 1,600 MWe
Mitsubishi Heavy Industry
- United States Advanced Pressurized Water Reactor (US APWR) – 1,700 MWe
|
|
Status of License Applications (23) Safety/Environmental Review Status
Announced Nuclear Locations
- Amarillo (TX)—Amarillo Power
- Bell Bend (PA)—PPL (formerly Susquehanna)
- Bellefonte (AL)—Tennessee Valley Authority
- Elmore County (ID)—Alternate Energy Holdings
- Callaway (MO)—AmerenUE
- Calvert Cliffs (MD)—UniStar
- Clinton (IL)—Exelon
- Comanche Peak (TX)—Luminant
- Fermi (MI)—DTE Energy
- Grand Gulf (MS)—Entergy
- Shearon Harris (NC)—Progress Energy
- Levy County (FL)—Progress Energy
- Nine Mile Point (NY)—UniStar
- North Anna (VA)—Dominion Energy
- River Bend (LA)—Entergy
- South Texas Project (TX)—STP Nuclear
- V.C. Summer (SC)—SCE&G
- Turkey Point (FL)—Florida Power & Light
- Victoria County (TX)—Exelon Generation
- Vogtle (GA)—Southern Nuclear
- William States Lee III (SC)—Duke Energy
|
|
|
|
 |
| |
Nuclear Power Deployment Scorecard |
| |
 |
Early Site Permit (ESP) > |
| |
- Three site permits issued by NRC (Clinton, Grand Gulf, North Anna)
- One site permit application under NRC review (Vogtle)
- Submission of three other ESP applications expected in 2010-2012 (including Victoria County)
|
 |
Combined Construction and Operating License (COL) > |
 |
License Applications Submitted to NRC (18)
- Twelve COLAs docketed and under review; one COLA submitted but not yet docketed
- Four COLAs are suspended pending technology decision or for financial reasons
- One docketed COLA is delayed as the power company focuses on a previously submitted COLA
- Submission of 5 additional COLs expected in 2009-2010
|
| |
 |
Status of Reference R-COLs
- All five R-COLs have been submitted and are undergoing NRC review (Bellefonte, Calvert Cliffs, Comanche Peak North Anna, South Texas Project, Vogtle)
|
 |
Reactor Design Certification (DC) > |
| |
- Two advanced reactor designs certified by NRC (ABWR and AP1000)
- Four reactor designs undergoing NRC review (ESBWR, US-EPR, AP1000 amend., and US-APWR)
|
 |
New Nuclear Plant Orders > |
 |
Long-Lead Equipment Orders
- Nine utilities have ordered large, long-lead nuclear component forgings from three reactor vendors
- Four steel containment shells and 24 reactor coolant pumps have been ordered for AP1000 units
- Two domestic large component facilities being built
- Japan Steel Works is the only manufacturer of ultra-large forgings; worldwide-capacity limited
|
| |
 |
Engineering, Procurement, and Construction Contracts (EPC)
- Four EPC contracts signed (Vogtle, V.C. Summer, STP and Progress)
|
 |
New Nuclear Plant Construction, Operation, & Deferral > |
| |
- No utility has committed to constructing a new advanced reactor
- TVA resumed construction of Watts Bar 2 and construction permits for Bellefonte 1 & 2 were reinstated
|
 |
Federal Financial Incentives > |
 |
Standby Support (Risk Insurance)
- Final 10 CFR Part 950 Rule issued August 11, 2006
- Two active Notices of Intent to Request a Conditional Agreement; a third notice has been withdrawn. One formal request under review by DOE.
|
| |
 |
Production Tax Credits
- Internal Revenue Bulletin 2006-18 published May 2006
- IRS considering revised guidance
|
| |
 |
Nuclear Power Loan Guarantees
- The Department is authorized to guarantee $18.5 billion in loans for nuclear power projects. First NRC-issued COL not expected before mid-2011.
- Fifteen power companies have submitted Part II applications by the December 19, 2008 deadline, requesting a total of $93 billion in loans to be guaranteed. The applications cover 10 sites with a total of 16 reactors, capable of providing 22 GW in generating capacity.
- DOE has narrowed the new reactors eligible to receive loan guarantee to five applicants.
|
|
| |
Scorecard Legend |
| |
 |
Implementation proceeding according to plan and schedule |
 |
Progress being made; however, issues or uncertainties exist that could impede progress |
 |
Unlikely to realize objectives absent significant management attention |
 |
No dates or end state established |
 |
Indicates change in status or progress since last evaluation |
 |
Regulatory Demonstration completed. No further government assistance is warranted. |
|
|
|