About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Home Button
Welcome Button
Mission Button
Our Organization Button
Our Programs Button
Advisory Committee Button
News Room Button
General Information
Document and Media Library Button
Job Opportunities Button
Sitemap Button
Stay Connected Header
Sign up for email Nuclear Energy alerts.
Jump into the Students zone!
Poster City Students click here!
Educators Header
Educators Image
Blue Ribbon Commission on America’s Nuclear Future

Nuclear Power Deployment Scorecard

Powering Future Decades

October 6, 2008

What's New

  • NRC docketed Progress Energy's COL application for two reactors in Levy County, FL on October 6, 2008.
  • Constellation Energy submitted a COL application on September 30 to build an EPR at Nine Mile Point in New York.
  • Seventeen power companies submitted 19 loan guarantee applications for 14 sites with a total of 21 reactors by the Part I deadline of 9/29/08.
  • Two fuel cycle companies have submitted loan guarantee applications by the 9/29/08 deadline.
  • On September 26, NRC announced a hearing for opportunity to intervene in UniStar's Calvert Cliffs COL. The date has not yet been established.
  • Entergy submitted a COL application to build an ESBWR at its River Bend facility in Louisiana on September 25.
  • NRC and the Army Corps of Engineers signed a Memorandum of Understanding on September 23, outlining each agency's role in the environmental aspect of nuclear plant licenses.
  • Luminant submitted a COL application for two US-APWR reactors at Comanche Peak near Glen Rose, TX on September 19. Luminant and Mitsubishi agreed to form a joint venture to develop the facility.
  • Detroit Edison submitted a COL application to build an ESBWR at its Fermi facility near Newport, MI on September 18.

Quick Statistics

  • Early Site Permits issued—3
  • Permits under review—1
  • COL applications submitted—16
        No. reactors submitted—25
  • COL applications docketed—10
        No. reactors docketed—17
  • Total expected license applications—23
        Expected number of reactors—34
  • Certified reactor designs—2
  • Reactor designs under review—4
  • Announced plant locations—20
  • Companies applying for COL—20

Number of Planned Reactors (34)

Number of Planned Reactors -- AP 1000:12(COL Submitted) and 2(Expected), ESBWR:6(COL Submitted), USEPR:3(COL Submitted) and 4(Expected), ABWR:2(COL Submitted), USAPWR:2(COL Submitted), Unspecified:3(Expected)

Vendor Technology Under Consideration

General Electric
  • Advanced Boiling Water Reactor (ABWR) – 1,356 MWe (certified 10CFR52 App A)
  • Economic Simplified Boiling Water Reactor (ESBWR) – 1,560 MWe
Westinghouse
  • Advanced Passive Pressurized Water Reactor (AP1000) – Twin units 1,117 MWe each (certified 10CFR52 App D)
AREVA
  • United States Evolutionary Pressurized Water Reactor (US EPR) – 1,600 MWe
Mitsubishi Heavy Industry
  • United States Advanced Pressurized Water Reactor (US APWR) – 1,700 MWe
 

Status of License Applications (23)

Status of License Applications-- Docketed:10, Under Review for Docketing:6, Expected in 2008:2, Expected in 2009:2, Expected in 2010:3

Announced Nuclear Locations

  • Bell Bend (PA)—PPL (formerly Susquehanna)
  • Bellefonte (AL)—Tennessee Valley Authority
  • Elmore County (ID)—Alternate Energy Holdings
  • Callaway (MO)—AmerenUE
  • Calvert Cliffs (MD)—UniStar
  • Clinton (IL)—Exelon
  • Comanche Peak (TX)—Luminant
  • Fermi (MI)—DTE Energy
  • Grand Gulf (MS)—Entergy
  • Shearon Harris (NC)—Progress Energy
  • Levy County (FL)—Progress Energy
  • Nine Mile Point (NY)—UniStar
  • North Anna (VA)—Dominion Energy
  • River Bend (LA)—Entergy
  • South Texas Project (TX)—STP Nuclear
  • V.C. Summer (SC)—SCE&G
  • Turkey Point (FL)—Florida Power & Light
  • Victoria County (TX)—Exelon Generation
  • Vogtle (GA)—Southern Nuclear
  • William States Lee III (SC)—Duke Energy
 
 

  Nuclear Power Deployment Scorecard

 
On Schedule Early Site Permit (ESP) >
 
  • Three site permits issued by NRC (Clinton, Grand Gulf, North Anna)
  • One site permit application under NRC review (Vogtle)
  • Submission of three other ESP applications expected in 2010-2012
On Schedule Combined Construction and Operating License (COL) >
On Schedule License Applications Submitted to NRC
  • Ten COLAs docketed (STP, Bellefonte, Harris, Grand Gulf, North Anna, Lee, Calvert Cliffs, Vogtle, V.C. Summer, and Levy Co.)
  • Six pending acceptance (River Bend, Callaway, Victoria Co., Fermi, Comanche Peak, Nine Mile Pt.)
  • Submission of 8 additional COLs expected in 2008-2010
  • One application expected in October (Bell Bend)
  Delayed Status of Reference R-COLs
  • All five R-COLs have been submitted; four (Bellefonte, North Anna, Calvert Cliffs, South Texas) have begun Phase 1 of the Safety Review
  • Comanche Peak is undergoing NRC acceptance review for docketing
On Schedule Reactor Design Certification (DC) >
 
  • Two advanced reactor designs certified by NRC (ABWR and AP1000)
  • Four reactor designs undergoing NRC review (ESBWR, US-EPR, AP1000 amend., and US-APWR
On Schedule New Nuclear Plant Orders >
On Schedule Long-Lead Equipment Orders
  • Nine utilities have ordered large, long-lead nuclear component forgings from three reactor vendors
  • Twenty-four reactor coolant pumps have been ordered for AP1000 units
  • Japan Steel Works is only manufacturer of ultra-large forgings; worldwide-capacity limited
  On Schedule Engineering, Procurement, and Construction Contracts (EPC)
  • Two EPC contracts initiated (Vogtle and V.C. Summer)
  • Plant engineering is in progress; completion required to start construction
Delayed New Nuclear Plant Construction, Operation, & Deferral >
 
  • No utility has committed to constructing a new advanced reactor
  • TVA has resumed construction of Watts Bar Unit 2 with completion scheduled in 2013
Delayed Federal Financial Incentives >
On Schedule Standby Support (Risk Insurance)
  • Final 10 CFR Part 950 Rule issued August 11, 2006
  • Three Notices of Intent to Request a Conditional Agreement received by DOE
  On Schedule Production Tax Credits
  • Internal Revenue Bulletin 2006-18 published May 2006
  Delayed Energy Facility Loan Guarantee
  • DOE issued solicitations for $18.5 billion in loan guarantees for new nuclear facilities and $2 billion for the nuclear fuel cycle on June 30, 2008
  • Seventeen power companies have submitted 19 applications for 14 sites. Two companies have submitted loan guarantee applications for fuel cycle facilities.
  • As construction cost estimates rise, the authorized amount for loan guarantees may be insufficient to catalyze follow-on nuclear construction fully financed by the private sector


 

  Scorecard Legend

 
On Schedule Implementation proceeding according to plan and schedule
Delayed Progress being made; however, issues or uncertainties exist that could impede progress
Failure Unlikely to realize objectives absent significant management attention
Unspecified No dates or end state established
Arrows Indicates change in status or progress since last evaluation
Check Regulatory Demonstration completed. No further government assistance is warranted.
folder iconArchived Scorecards
printer icon Scorecard - Printer Friendly Version (PDF 295 KB)
(Prints best on legal size paper - 8½ x 14)
Inspector General | DOE Directives | Small Business
The White House Link: Energy.Gov/RECOVERY usa.gov E-gov IQ FOIA Link: Privacy Program
Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment