About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Home Button
Welcome Button
Mission Button
Our Organization Button
Our Programs Button
Advisory Committee Button
News Room Button
General Information
Document and Media Library Button
Job Opportunities Button
Sitemap Button
Stay Connected Header
Sign up for email Nuclear Energy alerts.
Jump into the Students zone!
Poster City Students click here!
Educators Header
Educators Image
Blue Ribbon Commission on America’s Nuclear Future

Nuclear Power Deployment Scorecard

Moving Toward Deployment

May 5, 2008

What's New

  • On April 28, NRC announced a hearing for the William Lee COL application in South Carolina.
  • A second unnamed company has notified the NRC of its intent to pursue a COL.
  • NRC docketed Entergy's application to build an ESBW at their Grand Gulf site on April 17.
  • NRC docketed Progress Energy's application to build an AP1000 at their Harris site on April 17.
  • On April 11, DOE announced a planned loan guarantee solicitation this summer, including $18.5 billion for nuclear power facilities and $2.0 billion in the "front end" of the nuclear fuel cycle.
  • On April 11, NRC issued a 60-day extension for petition to Intervene in the COL for Bellefonte.
  • Georgia Power entered into an EPC contract with Westinghouse and the Shaw Group on April 8, 2008 for two Westinghouse AP1000 reactors at the Vogtle site in Georgia. The contract will be submitted to the Georgia Public Service Commission as a capacity request (expected May 2008), which will be reviewed with competing base-load generation bids.
  • Alternate Energy Holdings abandoned the proposed Bruneau site April 5 in favor of Elmore County, Idaho.
  • DOE and NRC issued a joint lessons learned report (PDF 1.8 MB) March 26 for NP2010 early site permits.

Quick Statistics

  • Early Site Permits issued—3
  • Permits under review—1
  • Total COL applications submitted—9
  • COL applications docketed—6
  • Certified reactor designs—2
  • Reactor designs under review—4
  • Expected license applications—23
  • Expected number of reactors—34
  • Nuclear plant locations—20
  • Companies applying for COL—20

Number of Planned Reactors (34)

Number of Planned Reactors -- AP 1000:10(COL Submitted) and 4(Expected), ESBWR:2(COL Submitted) and 3(Expected), USEPR:1(COL Submitted) and 6(Expected), ABWR:2(COL Submitted), USAPWR:2(Expected), Unspecified:4(Expected)

Vendor Technology Under Consideration

General Electric
  • Advanced Boiling Water Reactor (ABWR), 1,356 MWe (certified 10CFR52 App A)
  • Economic Simplified Boiling Water Reactor (ESBWR), 1,560 MWe
Westinghouse
  • Advanced Passive Pressurized Water Reactor (AP1000), Twin units 1,117 MWe each (certified 10CFR52 App D)
AREVA
  • United States Evolutionary Pressurized Water Reactor (US EPR), 1,600 MWe
Mitsubishi Heavy Industry
  • United States Advanced Pressurized Water Reactor (US APWR), 1,700 MWe
 

Status of License Applications (23)

Status of License Applications-- Docketed:6, Under Review for Docketing:3, Expected in 2008:10, Expected in 2009:1, Expected in 2010:3

Announced Nuclear Locations

  • Bellefonte (AL)—Tennessee Valley Authority
  • Elmore County (ID)—Alternate Energy Holdings
  • Callaway (MO)—AmerenUE
  • Calvert Cliffs (MD)—UniStar
  • Clinton (IL)—Exelon
  • Comanche Peak (TX)—Luminant (formerly TXU)
  • Fermi (MI)—DTE Energy
  • Grand Gulf (MS)—Entergy
  • Shearon Harris (NC)—Progress Energy
  • Levy County (FL)—Progress Energy
  • Nine Mile Point (NY)—UniStar
  • North Anna (VA)—Dominion Energy
  • River Bend (LA)—Entergy
  • South Texas Project (TX)—STP Nuclear
  • V.C. Summer (SC)—SCE&G
  • Susquehanna (PA)—PPL
  • Turkey Point (FL)—Florida Power & Light
  • Victoria County (TX)—Exelon Generation
  • Vogtle (GA)—Southern Nuclear
  • William States Lee III (SC)—Duke Energy
 
 

  Nuclear Power Deployment Scorecard

 
On Schedule Early Site Permit (ESP) >
 
  • Three site permits issued by NRC (Clinton, Grand Gulf, North Anna)
  • One site permit application under NRC review (Vogtle)
  • Submission of three other ESP applications expected in 2010-2012
On Schedule Combined Construction and Operating License (COL) >
On Schedule License Applications Submitted to NRC
  • Six COL applications docketed for NRC review (STP, Bellefonte, Harris, Grand Gulf, North Anna, Lee)
  • Three COL applications submitted to NRC awaiting acceptance (Calvert Cliffs, Vogtle, V.C. Summer)
  • Submission of 14 additional COLs expected in 2008-2010
  • Three applications expected in the 3rd quarter (Callaway, Comanche Peak, and Levy County)
  Unspecified Licenses to Build Issued by NRC
  • NRC anticipates issuing COL 42 months after docketing
On Schedule Reactor Design Certification (DC) >
 
  • Two advanced reactor designs certified by NRC (ABWR and AP 1000)
  • Four reactor designs undergoing NRC certification review (ESBWR, US-EPR, AP1000 amendment, and US-APWR)
Delayed New Nuclear Plant Orders >
Delayed Long-Lead Equipment Orders
  • Six utilities have ordered large long-lead nuclear component forgings with three reactor vendors
  • No other long-lead equipment (e.g., heat exchanger and generator) have been ordered to date
  • Japan Steel Works is only manufacturer of ultra-large forgings worldwide–capacity limited
  Delayed Engineering, Procurement and Construction Contracts (EPC)
  • One EPC contract initiated; negotiations on-going among vendors and several utilities
  • Plant engineering in progress; completion required to start construction
Unspecified New Nuclear Plant Construction, Operation & Deferral >
 
  • No utility has committed to constructing a new plant
Delayed Federal Financial Incentives>
On Schedule Standby Support (Risk Insurance)
  • Final 10 CFR Part 950 Rule issued August 11, 2006
  • Received first Notice of Intent to Request a Conditional Agreement – April 21, 2008
  On Schedule Production Tax Credits
  • Internal Revenue Bulletin 2006-18 published May 2006
  • Publish regulation for Production Tax Credit in FY08
  Delayed Energy Facility Loan Guarantee
  • Final 10 CFR Part 609 Rule amended January 18, 2008
  • Solicitation for small scale loan guarantees closed December 2006
  • No solicitation issued for nuclear plant loan guarantees
  • $18.5 billion approved for loan guarantees for nuclear plants December 2007
  • Implementation plan submitted to Congressional Committees April 11, 2008


 

  Scorecard Legend

 
On Schedule Implementation proceeding according to plan and schedule
Delayed Progress being made; however, issues or uncertainties exist that could impede progress
Failure Unlikely to realize objectives absent significant management attention
Unspecified No dates or end state established
Arrows Indicates change in status or progress since last evaluation
Check Regulatory Demonstration completed. No further government assistance is warranted.

folder iconArchived Scorecards
printer icon Scorecard - Printer Friendly Version (PDF 210 KB)
(Prints best on legal size paper - 8½ x 14)
Inspector General | DOE Directives | Small Business
The White House Link: Energy.Gov/RECOVERY usa.gov E-gov IQ FOIA Link: Privacy Program
Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment